Frameless Glass Shower Installation
- Service
- Glass
- Location
- On request
- Year
- 2025
- Scope
- Site measurement · Panel configuration · Hardware coordination · Installation & sealing
Case Study
A frameless enclosure measured to the finished tile and installed with consistent reveals.
- Challenge
- The finished opening was slightly out of plumb, a common condition that becomes visible the moment glass is installed.
- Approach
- Measurement was taken after tiling, and the panel configuration was adjusted to absorb the deviation rather than fight it.
- Execution
- Hardware positions were set out first, then panels were installed and aligned before sealing.
- Result
- An enclosure that disappears into the room instead of drawing attention to its edges.
Gallery


Details
- Consistent reveal at the wall
- Matte black hardware
- Clean, minimal sealant line