Floor Leveling and Subfloor Preparation — completed work by EverPeak Elite

Floor Leveling and Subfloor Preparation

Service
Flooring
Location
On request
Scope
Existing floor surveyed for high and low spots · Surface prepped and primed · Levelling compound applied and screeded · Surface cured flat and ready for finish flooring

Case Study

A leveling service correcting dips, slopes and uneven areas to leave a flat, ready-to-finish subfloor.

Challenge
Any dip or slope in a subfloor telegraphs straight through the finished floor laid over it, so the base has to be made flat before anything goes down.
Approach
The floor was surveyed for high and low spots so the correction could be targeted rather than applied blanket across the room.
Execution
High and low spots were mapped, the surface prepped and primed, levelling compound applied and screeded, then left to cure flat and ready for finish flooring.
Result
A flat, primed subfloor cured and ready to take a finished floor.

Gallery

Project Gallery

01/04

Floor leveling compound applied to an uneven subfloor to create a flat surface ready for finish flooring (view 1)

Floor leveling compound applied to an uneven subfloor to create a flat surface ready for finish flooring (view 1)

Drag, swipe or use the arrows — 4 photos

Details

  • High and low spots surveyed
  • Primed before pouring
  • Screeded flat and cured

Next Project

Glue-Down Vinyl Flooring Installation Across Multiple Offices

Free Estimate

Planning Something Similar?

Tell us about your space and what you have in mind. We'll help you understand the next step.

CallFree Estimate